Ongoing Project

Construction of 2 Nos shaft of Cast-In-Situ RCC- Diaphragm wall of 1200mm thickness and its allied works

Details of Work:

Construction of Single Line BG Tunnel No. 12 (Approx. Length 9551.00 RM) from Ch. 105840.00 to 115391.00 and Adit-1 (Approx. Length 1440.00 RM) at Ch. 112623.00 and Adit- 2 (Approx. Length 420.00 RM) at Ch.115391.00 in between Tupul - Imphal in connection with construction of New Line Project, Jiribam-Imphal (Two Pocket System) by N.F. Railway, Imphal, Manipur.

Client:

Vensar Constructions Company Limited 

Contract Value:

Rs. 1550 Lacs (Aprox.)

Piling Works at Maharani Bagh DND-Jaitpur Flyover of Package-1

Details of Work:

Providing and installing cast-in-setu vertical bored piles of depth as per drawing. 1500MM Dia pile hydraulic rig using partial partial depth temporary casing and polymer.

Client:

Dinesh Chandra R Agarwal Infracon Pvt. Limited

Contract Value:

Rs. 170 Lacs (Aprox.)